CITY OF OBERLIN
|
![]() |
![]() |
|
Owner: The City of Oberlin As lead contractor, Dunlop & Johnston, Inc. coordinated
all prime contractors in construction of this state of the art $5 Million
Dollar project consisting of 4 buildings situated on a 15 acre fully
developed site. The 26,800 SF Pre-Engineered main building houses the
public works general maintenance administrative offices, a sign shop,
vehicle storage facility as well as a four truck maintenance bays including
a four post lift, a heavy truck parallelogram lift, as well as a 3-ton
overhead bridge crane. Other facilities on site include a 7680 SF cold
storage building, a 8680 SF refuse truck storage facility with a recycling
sorting area and truck wash, and a 4700 SF concrete and wood framed
salt and raw material storage building. Said facilities are set on a
fully fenced and secured site along with an automated fueling island. |
|
![]() |
![]() |